CIRB Tenders 2013 and pre tender meeting

Our tenders have now been verified and are available to download below. We have arranged the Pre-Tender meeting to take place on Wednesday 6th March 2013. This will be in at ART offices which are located in the Engineering Department, Donald Hendrie Building,...

Culroy Burn

Following up on the surveys we undertook on the Culroy Burn last year, I decided to take a look at it today on my way back from a farm visit. We recently had a report of American Signal Crayfish on this burn. Although a bit early in the season yet, I thought I would...

Doon Levels

I received a message today from a concerned Doon owner about the ‘supposed winter compensation flow’. The river was well down on where it should be at this time of the year and he was concerned that the calibration was incorrect. He was right and wrong at...

Another one bites the dust!

The Cronin Building at Auchincruive is in the process of being demolished. ART’s first office was in this building was  way back in the early days. I first met Brian and Pete there in 2005 when I was a student at Auchincruive and it was with a tinge of sadness...