Draught Burn (Lugton Water) – Fish Rescue

Today Muir and I carried out a fish rescue on behalf of Scottish Water/Caledonia Water. A new pipeline will cross the Draught Burn (tributary of the Lugton Water) at Eglinton Country Park which required an area of approx. 70m to be over pumped for a period of 24 hours...

How to build a shed….

Today saw Stuart and I taking a departure from our usual work and turn our hand to ‘carpentry’ as we began building a new shed in the office garden to expand our storage. Over the years we have amassed a vast array of equipment and whilst we have two...

Kinclair Viaduct – Stinchar Catchment

In 2015 works were underway to repair parts of the Kinclair Viaduct on the Stinchar catchment. These repairs were to include bank reinforcements on the burn which runs under the viaduct and joins the Water of Assel about 50m downstream of the viaduct. Last year Struan...

Surveys pre Gravel Cleaning

We’ve been planning to perform experimental gravel cleaning on a few sites on the Ayr that are affected by siltation or enrichment. The aim will be to see if by removing the fine sediments that choke the spawning beds, whether we can increase egg survival and...